Door & Frame Installation: Step-by-Step Guide
Door & Frame Installation: Step-by-Step Guide Intro
Published 08 April 2025
Site Preparation
Module 1: Introduction and Tools required
Module 2: Delivery of doors against floor-plan schedule
Module 3: Checking dimensions of supplied doors and frames against openings
Assembly, preparation and installation of door frame
Module 4: Doorframe assembly and preparation
Module 5: Doorframe installation
Preparation and installation of door leaf
Module 6: Door leaf preparation
Module 7: Door leaf installation and correct fit and gap checks
Installation of lock and handles
Module 8: Installation of lock cases, strike plates and lever handles
Fitting door stops, gaskets and architraves
Module 9: Fitting of door stops and cold smoke or slam gaskets
Module 10: Fitting of architraves
Installation of door closer and fire signage plus sign off of fire certification
Module 11: Door closers and fire door keep shut signs
Module 12: Fire label application and fire certificate sign-off and filing