Forza detailed drawings & specifications

ssIn order to view or download our technical information you need to register to create a login. If you've already registered and received our authorisation email please login below.

Login

*
*

Terms & Conditions of use

By clicking proceed you agree to our terms and conditions of use

REGISTER HERE to set up your user login
Forgot your password?

Register

*
*
*
*
*
*

* indicates a mandatory field

*

By clicking register you agree to our terms and conditions of use

<< Back to login

Enter your email address below

<< Back to login

Tel: 01403 711126 |
Forza - Defining Doors

Why not also take a look at some of our other manufacturing processes:

Our Factory

Manufacture of a Frame

The following narrative and photographs give a brief overview of the Forza production technique that has been specifically developed to support the demands and needs of the construction industry for a 10 to 14 day lead time.

Order process

By similar method to the door and panel order process we will have received confirmation of specification, dimensions and accepted price, and then programme production to meet the required delivery date.

Rip Saw

To minimise material wastage, suitable thickness boards of the required timber specie are selected for colour and sawn to the required width.

CNC Multi head profile moulder

Sawn timber is planed/moulded on all 4 sides in one pass to the required dimension. At this stage any grooving, bevelling or radiusing is also carried out.

Frame conditioning /Half lap mortice and tennon or mitred

Planed/moulded frame sections are secondary machined on CNC machines to form accurate joint conditions for onsite or factory assembly.

Profile Sanding

Machined sections are fine sanded prior to finishing.

Finishing

Prior to assembly or packaging of component parts the finishing process completes the manufacture. This is carried out depending on the sections by hand spray or uv roller coat applied lacquer.